Wilson Avenue Street Improvements – East Avenue to Wardman Bullock Road

Aufbau provided engineering design, construction inspection, and engineering and construction management support services for the construction of Wilson Avenue – between East Avenue and Wardman Bullock Road, and pavement reconstruction of Wilson Avenue between Wardman Bullock Road and Cherry Avenue – for a total distance of approximately 1.5 miles.

The project introduced a two lane roadway between East Avenue and Wardman Bullock Road – one lane of traffic in each direction, bike lanes in each direction, and a roundabout at the intersection of East Avenue and Wilson Avenue. The traffic signal at the intersection of Wilson Avenue and Wardman Bullock Road also was modified to accommodate the new roadway construction and the new intersection geometry.

The project entailed mass grading of the project site to accommodate the new roadway profile, relocation of an existing 24-inch diameter Cucamonga Valley Water District water mainline, construction of major reinforced concrete structures, construction of storm drain facilities, construction of two wildlife crossings, construction of curb and gutters and sidewalk, asphaltic concrete paving, perimeter fencing, street lights, and pavement markings and striping.

The project also entailed extensive coordination with Metropolitan Water District, which owned and operated a 98-inch diameter water transmission line along the newly constructed Wilson Avenue, coordination with Cucamonga Valley Water District for the relocation of its water mainline, Inland Empire Utility Agency for the relocation of their conflicting facilities, and San Bernardino County Flood Control District for the removal and reconstruction of its drainage facilities.

Aufbau prepared the construction drawings and the specifications for construction of two wildlife crossings at Wilson Avenue, between East Avenue and Wardman Bullock Road, and the conduit installations for the wiring of video cameras – to monitor the wildlife activities crossing under Wilson Avenue.

Location: Rancho Cucamonga, CA
Client: City of Rancho Cucamonga
Construction Cost: $5.5M
Services provided:

  • Engineering design
  • Construction inspection
  • Engineering and construction management support services

A huge thank you for Aufbau’s engineering design and construction management support services for Wilson Avenue improvement project. The project had many design and construction challenges in order to meet the regulatory requirements of the U.S. Army Corps of Engineers, San Bernardino County Flood Control District, Metropolitan Water District of Southern California, California Department of Fish and Wildlife, Inland Empire Utilities Agency, and Cucamonga Valley Water District. Aufbau’s foresight and ability to effectively manage the contractor’s construction operations was critical in keeping the project on budget and on schedule, and protecting the City from potential construction claims.

 

 

Walter Stickney, P.E. | Associate Civil Engineer

City of Rancho Cucamonga